A robust schedule for Montpellier's Tramway network

Ullrich, Oliver and L├╝ckerath, Daniel and Speckenmeyer, Ewald (2015) A robust schedule for Montpellier's Tramway network.
Published in: Simulation Notes Europe Vol. 25 (1). pp. 1-8. ISSN 2306-0271

This is the latest version of this item.

Abstract

The city of Montpellier in the Languedoc-Roussillon region of France features a fast growing tram network as a central part of its public service infrastructure. Here, as in many other tram networks, resources like tracks and stations are shared between different lines. Because of the resulting dependencies, small inevitable delays can spread through the network and affect its global performance. Abstract This article examines whether a robust tram schedule may help to raise punctuality in Montpellier's tram network. To accomplish this, we apply a tool set designed to generate schedules optimized for robustness, which also satisfy given sets of planning requirements. These tools allow to compare time tables with respect to their punctuality and other key indicators. Abstract After an introduction to the goals of this paper, we continue with a description of the tool set focusing on optimization and simulation modules. These software utilities are then employed to generate and simulate robust and non-robust schedules for Montpellier's tram network, which are subsequently compared for the resulting delays.


Actions:
Download: [img] PDF - Published Version
Download (7MB)
Download: [img] PDF - Preprinted Version
Download (703kB) | Preview
Editorial actions: View Item View Item (Login required)
Deposit Information:
ZAIK Number: UNSPECIFIED
Depositing User: Daniel L├╝ckerath
Date Deposited: 22 Sep 2015 09:26
Last Modified: 22 Sep 2015 09:26
URI: http://e-archive.informatik.uni-koeln.de/id/eprint/885

Available Versions of this Item